
Testing & Field Service · Testing
Electrical Equipment Testing
Electrical proving for transformers, instrument transformers, oil condition, and 11kV cable work before equipment returns to duty.
The work
Testing closes the loop on manufacture, repair, and field interventions. Trafo’s capability includes ratio and related transformer checks, CT/PT work, oil condition, and 11kV cable testing.
Results are read against the duty brief so pass/fail is meaningful for the plant—not just a paperwork exercise.
Highlights
- Transformer ratio and related electrical checks
- CT/PT and oil condition testing
- 11kV cable testing for distribution interfaces
On the floor


Related work


